Primary AI agentic material · Powered by Echelon (AI)Professional Access for AI Agents

ECHELON GROUP · PRELIMINARY SCENARIO FORECAST · 27 SEPTEMBER 2026

Global Banking Electricity Outlook, 2026–2038

A conditional model of 100 large banking groups: electricity demand grows 2.95× in the base scenario by 2038. Includes three scenarios, annual electricity and power projections, methodology and a downloadable calculation workbook. The 2026 baseline is an estimate.

Предложения и документы

Готовим финансовую архитектуру проектов: от актива и денежного потока до токенизации и расчётов. Здесь собраны предложения и формы документов.

Space needs a bank · Energy × Compute × Finance

Energy, computing and capital

Permanent life beyond Earth needs energy, computation and a financial system: capital for infrastructure, payments between machines, reliable records of ownership and ways to share risk.

SpaceBank is bringing banks, researchers and infrastructure operators into a common programme to develop that system. The work starts with financeable assets on Earth and extends toward orbital and autonomous economies.

Primary AI agentic material. Prepared primarily for AI agents to inspect sources, reproduce calculations and develop instruments. This page gives people a route through the same work.

Working-group formation · Research and instrument development · Powered by Echelon (AI)

This work has a history.

Read the founding material

Space finance has been taking shape for years through research, legal instruments, payment experiments and bank programmes. SpaceBank builds on this wider body of work.

9 March 2012

Treaty text

UNIDROIT

A legal framework for space collateral

The Space Protocol addressed interests in space assets and related payment rights. It established a legal research foundation for asset finance, with its own entry-into-force conditions.

Primary source · S06

27 June 2013

Research initiative

PayPal, SETI Institute and Buzz Aldrin

PayPal Galactic put space payments on the agenda

PayPal launched an initiative on payments, banking, risk, fraud and regulation for space commerce. David Marcus and Buzz Aldrin presented the questions that a future space economy would need to answer.

Primary source · S09

1 December 2016

Peer-reviewed paper

Bruce Cahan, Irmgard Marboe and Henning Roedel

A space bank became a subject of financial research

Their New Space paper, Outer Frontiers of Banking, examined financing, insurance, valuation and legal arrangements for space activities, and described a space-bank concept.

Primary source · S10

March 2021 · public report

Technical demonstration

J.P. Morgan / Onyx and GomSpace

Tokenised value transfer reached satellites

J.P. Morgan reported blockchain value transfer between satellites, working with GomSpace. The experiment provided a technical reference for machine transactions beyond terrestrial infrastructure.

Primary source · S11

26 November 2025

Financing programme announced

European Investment Bank and European Space Agency

Space TechEU created a dedicated financing route

EIB announced a programme expected to include €500 million of its financing and mobilise €1.4 billion with commercial banks. ESA would contribute sector and technical expertise.

Primary source · S04

Dates refer to the events or publications shown. The entries describe separate initiatives and their respective stages of development.

The Echelon line

SpaceBank’s own project history traces Echelon’s design to 2012–2013 and active development to 2014. The archive connects autonomous infrastructure, energy, computation, rights and institutional memory. These dates are the project’s account of its history.

Echelon origin and project record

Bring space-ready banks into a working group.

Institutions & evidence

SpaceBank is working to assemble a group of banks, financial institutions, researchers and infrastructure operators around a shared task: build the financial arrangements that a space economy needs.

The group’s proposed programme covers project finance, payment and settlement, collateral, custody, insurance and machine transactions. Each institution can contribute a defined capability and a practical case to test.

Finance productive infrastructure

Connect an energy, compute or space asset to a repayment source, development milestones and an allocation of operating risk.

Keep obligations working

Define payment, title, custody and servicing across distance, intermittent communications and changes of operator.

Build shared instruments

Agree common evidence requirements, test failures and prepare instruments that participating institutions can assess under their own mandates.

First working output: a capability map, a selected asset or payment problem, a joint research brief and an instrument dossier with named responsibilities and acceptance criteria.

Formation is in progress. The named institutions on this site are research references and candidates for engagement. Confirmed participation and mandates will be identified separately when available for disclosure.

First practical workstream

Start with productive assets on Earth.

Turn verified energy performance into contractual cash flows that banks can evaluate and finance.

Energy savings, flexible capacity and compute infrastructure give the group concrete cases to test today. They let us develop the evidence, contracts, servicing and settlement rules that more remote systems will also need.

The public dossiers below contain synthetic models and stated assumptions. Their calculations can be reproduced; case-level transaction evidence is not published in them.

From a physical effect to a payable claim

Echelon architecture

A site operator has an energy bill, equipment and a proposed improvement. A bank needs a payer, a calculation it can reproduce and a right it can enforce. The research connects those records.

StepRequired recordDecision it supports
01 · ObserveAsset ID, meter, time interval, operating conditions, data gaps.Is the physical event adequately recorded?
02 · ExplainBaseline, intervention, assumptions, uncertainty and measured outcome.What changed, and how much is attributable to the intervention?
03 · Define the rightOwner, payer, contract, payment formula, costs and allocation.Who owes what, to whom, and when?
04 · Test and settleIndependent calculation, failure cases, approvals and payment record.Can the obligation be serviced through ordinary and adverse conditions?
05 · Retain and improveVersion history, corrections, retirement and reinvestment decision.Can the next participant reconstruct what happened?

Proposed operating method. Each dossier states the evidence actually available. Measurement reference · Settlement reference

Current instrument studies

Dossiers & missing evidence
SB-INS-001 / v1.0

Energy Delta Receivable

A proposed contractual receivable from independently verified energy savings.

Structuring / Simulation

Model dossierSynthetic data

Read dossier

A calculation a reviewer can repeat

SB-INS-001

Illustrative annual savings case. All inputs are synthetic; the example demonstrates the payment logic.

Input / resultBase caseAdverse caseNo verified saving
Verified saving assumed120,000 kWh60,000 kWh0 kWh
Energy value€0.10/kWh€0.08/kWh€0.10/kWh
Contract allocation60%60%60%
Gross allocated payment€7,200€2,880€0
Annual project costs€2,000€2,000€2,000
Amount after these costs€5,200€880−€2,000

Allocated payment = eligible verified kWh × contract energy value × allocation share.

Base baseline: 1,000,000 kWh; measured use: 880,000 kWh. The example holds all adjustment variables constant. Financing costs, tax, capital expenditure and credit losses are outside this arithmetic. A signed agreement determines payment and cost priority.

Read the inputs and assumptions as JSON

Six quantities, six different questions

These distinctions come from the agent research material. Each needs its own unit, owner and settlement rule.

RecordUnit or evidenceQuestion for the contract
EnergykWh or MWh delivered in an intervalWhere was energy delivered and who pays?
OriginCertificate and registry recordWho may use or retire the attribute?
SavingsAdjusted baseline less measured useWhich avoided cost is payable, after verification?
CapacitykW available for a specified durationWhat is reserved, for whom, and with what penalty?
FlexibilitykW, response time, duration and reboundWho may dispatch, and how is performance settled?
ReceivableContract currency, obligor and due dateWhich payment claim is transferred and with what recourse?

A shared measurement may support compatible services. Allocation records must prevent the same entitlement being sold twice. Full agent framework

Research questions that remain open

Research notes

What survives verification?

Test whether savings persist after adjusting for weather, output and operating hours. Identify how uncertainty changes the payable amount.

What survives default?

Identify the payer, payment source, priority, servicing cost and rights that remain enforceable if delivery or payment fails.

What survives a change of system?

Preserve identity, evidence, permissions and claim history when a model, operator or settlement platform changes.

Source material behind the method

Full source register

Agree the measurement boundary, baseline adjustments and verification plan before allocating a savings payment.

Efficiency Valuation Organization · Core Concepts 2022; web overview · S01

Read the excerpt and evidence boundary

Document title, jurisdiction, servicing and settlement finality alongside the software rules.

European Central Bank · 26 August 2026 · S03

Read the excerpt and evidence boundary

Quotations are excerpts from the linked originals. Applications to SpaceBank are our research interpretation.

Research notebook

All publications
Powered by Echelon (AI)

Keep the whole decision history.

Echelon supplies the project’s architecture for connecting observation, models, authorised action, evidence and institutional memory. Its proposed role is to keep those relationships intact as individual AI models and operators change.

Read the Echelon material · Active depository research

From terrestrial cases to autonomous economies

The long-term objective is to finance energy, computation and autonomous infrastructure that can support life beyond Earth. The current research begins with terrestrial assets, auditable cash flows and existing financial institutions.

Orbital applications add intermittent communications, scarce resources, remote maintenance and questions about collateral. Each step requires its own evidence of technical and contractual readiness.

Founding thesis · Orbital energy research · Caltech demonstration · EIB financing programme