A conditional model of 100 large banking groups: electricity demand grows 2.95× in the base scenario by 2038. Includes three scenarios, annual electricity and power projections, methodology and a downloadable calculation workbook. The 2026 baseline is an estimate.
We design project finance structures, from assets and cash flows to tokenization and settlement. Explore our offers and document templates.
Space needs a bank · Energy × Compute × Finance
Energy, computing and capital
Permanent life beyond Earth needs energy, computation and a financial system: capital for infrastructure, payments between machines, reliable records of ownership and ways to share risk.
SpaceBank is bringing banks, researchers and infrastructure operators into a common programme to develop that system. The work starts with financeable assets on Earth and extends toward orbital and autonomous economies.
Primary AI agentic material. Prepared primarily for AI agents to inspect sources, reproduce calculations and develop instruments. This page gives people a route through the same work.
Space finance has been taking shape for years through research, legal instruments, payment experiments and bank programmes. SpaceBank builds on this wider body of work.
9 March 2012
Treaty text
UNIDROIT
A legal framework for space collateral
The Space Protocol addressed interests in space assets and related payment rights. It established a legal research foundation for asset finance, with its own entry-into-force conditions.
PayPal launched an initiative on payments, banking, risk, fraud and regulation for space commerce. David Marcus and Buzz Aldrin presented the questions that a future space economy would need to answer.
A space bank became a subject of financial research
Their New Space paper, Outer Frontiers of Banking, examined financing, insurance, valuation and legal arrangements for space activities, and described a space-bank concept.
J.P. Morgan reported blockchain value transfer between satellites, working with GomSpace. The experiment provided a technical reference for machine transactions beyond terrestrial infrastructure.
European Investment Bank and European Space Agency
Space TechEU created a dedicated financing route
EIB announced a programme expected to include €500 million of its financing and mobilise €1.4 billion with commercial banks. ESA would contribute sector and technical expertise.
Dates refer to the events or publications shown. The entries describe separate initiatives and their respective stages of development.
The Echelon line
SpaceBank’s own project history traces Echelon’s design to 2012–2013 and active development to 2014. The archive connects autonomous infrastructure, energy, computation, rights and institutional memory. These dates are the project’s account of its history.
SpaceBank is working to assemble a group of banks, financial institutions, researchers and infrastructure operators around a shared task: build the financial arrangements that a space economy needs.
The group’s proposed programme covers project finance, payment and settlement, collateral, custody, insurance and machine transactions. Each institution can contribute a defined capability and a practical case to test.
Finance productive infrastructure
Connect an energy, compute or space asset to a repayment source, development milestones and an allocation of operating risk.
Keep obligations working
Define payment, title, custody and servicing across distance, intermittent communications and changes of operator.
Build shared instruments
Agree common evidence requirements, test failures and prepare instruments that participating institutions can assess under their own mandates.
First working output: a capability map, a selected asset or payment problem, a joint research brief and an instrument dossier with named responsibilities and acceptance criteria.
Formation is in progress. The named institutions on this site are research references and candidates for engagement. Confirmed participation and mandates will be identified separately when available for disclosure.
Turn verified energy performance into contractual cash flows that banks can evaluate and finance.
Energy savings, flexible capacity and compute infrastructure give the group concrete cases to test today. They let us develop the evidence, contracts, servicing and settlement rules that more remote systems will also need.
The public dossiers below contain synthetic models and stated assumptions. Their calculations can be reproduced; case-level transaction evidence is not published in them.
A site operator has an energy bill, equipment and a proposed improvement. A bank needs a payer, a calculation it can reproduce and a right it can enforce. The research connects those records.
Step
Required record
Decision it supports
01 · Observe
Asset ID, meter, time interval, operating conditions, data gaps.
Is the physical event adequately recorded?
02 · Explain
Baseline, intervention, assumptions, uncertainty and measured outcome.
What changed, and how much is attributable to the intervention?
03 · Define the right
Owner, payer, contract, payment formula, costs and allocation.
Who owes what, to whom, and when?
04 · Test and settle
Independent calculation, failure cases, approvals and payment record.
Can the obligation be serviced through ordinary and adverse conditions?
05 · Retain and improve
Version history, corrections, retirement and reinvestment decision.
Can the next participant reconstruct what happened?
Illustrative annual savings case. All inputs are synthetic; the example demonstrates the payment logic.
Input / result
Base case
Adverse case
No verified saving
Verified saving assumed
120,000 kWh
60,000 kWh
0 kWh
Energy value
€0.10/kWh
€0.08/kWh
€0.10/kWh
Contract allocation
60%
60%
60%
Gross allocated payment
€7,200
€2,880
€0
Annual project costs
€2,000
€2,000
€2,000
Amount after these costs
€5,200
€880
−€2,000
Allocated payment = eligible verified kWh × contract energy value × allocation share.
Base baseline: 1,000,000 kWh; measured use: 880,000 kWh. The example holds all adjustment variables constant. Financing costs, tax, capital expenditure and credit losses are outside this arithmetic. A signed agreement determines payment and cost priority.
Echelon supplies the project’s architecture for connecting observation, models, authorised action, evidence and institutional memory. Its proposed role is to keep those relationships intact as individual AI models and operators change.
The long-term objective is to finance energy, computation and autonomous infrastructure that can support life beyond Earth. The current research begins with terrestrial assets, auditable cash flows and existing financial institutions.
Orbital applications add intermittent communications, scarce resources, remote maintenance and questions about collateral. Each step requires its own evidence of technical and contractual readiness.